0CHMK - VP celk top 1
CHMK - VP5 hutn¡k
CHMK - VP1 bustle pipe
CHMK - ŸiçtØn¡ konvertoru
CHMK - ocel rna
CHMK - ocel rna celk
CHMK - kontilit¡ celk
CHMK - kontilit” side b
CHMK - hrubovac” stojan
CHMK - kontilit” teplota
CHMK - stojanfront
CHMK - v lcovna hrubovac¡
CHMK - v lcovna pec
CHMK - v lcovna stojanyfront
Exit full screenEnter Full screen
 
previous arrow
next arrow
0CHMK - VP celk top 1
CHMK - VP5 hutn¡k
CHMK - VP1 bustle pipe
CHMK - ŸiçtØn¡ konvertoru
CHMK - ocel rna
CHMK - ocel rna celk
CHMK - kontilit¡ celk
CHMK - kontilit” side b
CHMK - hrubovac” stojan
CHMK - kontilit” teplota
CHMK - stojanfront
CHMK - v lcovna hrubovac¡
CHMK - v lcovna pec
CHMK - v lcovna stojanyfront
previous arrow
next arrow

Chelyabinsk

CHMK Chelyabinsk

Chelyabinsk Metallurgical Plant (ChMK) is one of Russia’s largest integrated steelmakers producing quality and high-quality steel. ChMK is rare among Russian plants in that it has the right to grant its products its own index – ChS (Chelyabinsk Steel). The plant is also Russia’s biggest stainless steel producer.

ChMK manufactures a wide range of steel products – pig iron, steel semi-finished products for further processing, long and flat products from carbon, structural, tool and corrosion-proof steel, beams and rail products.

Chelyabinsk Metallurgical Plant uses a simulation model for electric furnace Melting Shop

The model simulates the redesigned ground environment and production processes of the shop floor to be renovated. This is the first production simulation modeling project experienced by Chelyabinsk Metallurgical Plant (CHMK), part of the global mining and metal manufacturing company Mechel group. The shop floor model was created by Russian simulation software developers The AnyLogic Company.

*https://www.anylogic.com/resources/case-studies/chelyabinsk-metallurgical-plant-uses-a-simulation-model-electric-furnace-melting-shop/

Image photography

By Viktor Macha in 2005.

Plant facts and figures

The plant have an annual capacity of 1100000 tons.

The following processes are conducted in the plant:

  • Mining
  • Steel making
  • Rolling mill

This plant produces the following type of products:

  • Billets
  • Slabs
  • Wires

Full description

Construction of Chelyabinsk Metallurgical Combine started in 1943 in order to provide enough steel for tanks production in the last years of World War II.

In the first stage the electric steel plant, foundry, forging and machining shop were put into operation. The first blast furnace and coke batteries followed in stage 2 (1944).

The plate mill, section rolling mill and blooming mill were constructed during the 50´s.

In 1965 the open-hearth steel mill was built and was in operation until 1996 when replaced by brand new LD converter steel plant.

Since 2001 the Chelyabinsk Metallugcial Plant is part of Mechel holding as one of the largest integrated combines in Russia.

In 2013 new universal mill was commissioned.

The factory has 18,000 employees now.

Main data

Owner

The plant is owned by Mechel Holding

Address

Plant address: 2-ya Paveletskaya street, 14, Chelyabinsk, Chelyabinsk region, Russia, 454047

Country

The plant is located in Russia

Find similar plants

Steel Plants Search Compact

CHOOSE LOCATION

CHOOSE YEAR PHOTOGRAPHED

CHOOSE CAPACITY

2000000

CHOOSE PROCESS

CHOOSE PRODUCTS

CHOOSE CREATOR

Latest plants on our platform