Paskov Staric
Důl Paskov – Staříč
The history of the largest coking coal mine in the Ostrava-Karviná region ended on March 30th 2017, when the last minecart was extracted.
The pit no. III was demolished on 15th of February 2022.
https://www.novinky.cz/clanek/domaci-konec-jedne-ery-kamera-zachytila-demolici-tezni-veze-dolu-staric-iii-40387290
Image photography
By Viktor Macha in 2021.
Plant facts and figures
The plant have an annual capacity of 0 tons.
The following processes are conducted in the plant:
- Mining
This plant produces the following type of products:
- Coal&Iron&Minerals
Full description
The history of the largest coking coal mine in the Ostrava-Karviná region ended on March 30th 2017, when the last minecart was extracted.
Paskov mine, locality Sviadnov: 1962 – 2017
Paskov mine, locality Staříč: 1963 – 2017
Paskov mine, locality Chlebovice – 1963 – 2017
Paskov mine, localityPaskov: 1961-1999
The typologically unique circular mining tower with the Koeppe winding engine room located in the tower within the Sviadnov locality was built in 1965 according to the design of architect Ivo Lange and has been registered as a cultural monument in 2000. However its fate is unclear.
The rest of the surface objects on other localities will be demolished.