Montenotte
Italianacoke Cairo Montenotte
It was back in 1897 when the company "Società Anonima Coke e Derivati" built the first coke plant in Sevona. In 1911 the entire site was relocated to the nearby industrial area of Vado Ligure, with its own coal harbour.
Italiana Coke and Paul Wurth to trial new process tech to reduce CO2 emissions
Italiana Coke and Paul Wurth to trial new process tech to reduce CO2 emissions
Image photography
By Viktor Macha in 2022.
Plant facts and figures
The plant have an annual capacity of 700000 tons.
The following processes are conducted in the plant:
- Coke plant
This plant produces the following type of products:
Full description
It was back in 1897 when the company “Società Anonima Coke e Derivati” built the first coke plant in Sevona. In 1911 the entire site was relocated to the nearby industrial area of Vado Ligure, with its own coal harbour.
In 1912 the aerial ropeway was put into operation.
As the demand for coke increased steadily in the first half of the twentieth century, it was decided to build a new coking plant at Cairo Montenotte in 1936. The original composition with three coking batteries was expanded by two more by 1956.
In 1975 the coke works were merged with the coking plant at Vado Ligure and in 1980 with the other two plants at Avenza and Porto Marthera.
During the privatisation in 1994 the Cairo Montenotte coking plant became independent and the “Italiana Coke” was formed.
The aerial ropeway transporting the coal from the port of Savona is 17 kilometres long.