viktormacha_huachipato-31
Exit full screenEnter Full screen
 
previous arrow
next arrow
viktormacha_huachipato-31
viktormacha_huachipato-29
viktormacha_huachipato-25
viktormacha_huachipato-90
viktormacha_huachipato-50
viktormacha_huachipato-76
viktormacha_huachipato-1
viktormacha_huachipato-41
viktormacha_huachipato-40
viktormacha_huachipato-63
viktormacha_huachipato-68
viktormacha_huachipato-72
viktormacha_huachipato-73
viktormacha_huachipato-74
viktormacha_huachipato-75
viktormacha_huachipato-78
viktormacha_huachipato-80
viktormacha_huachipato-81
viktormacha_huachipato-77
viktormacha_huachipato-129
viktormacha_huachipato-99
viktormacha_huachipato-93
viktormacha_huachipato-16
viktormacha_huachipato-15
viktormacha_huachipato-5
viktormacha_huachipato-6
viktormacha_huachipato-9
viktormacha_huachipato-11
viktormacha_huachipato-12
viktormacha_huachipato-116
viktormacha_huachipato-118
viktormacha_huachipato-112
viktormacha_huachipato-111
viktormacha_huachipato-108
viktormacha_huachipato-107
viktormacha_huachipato-113
viktormacha_huachipato-105
viktormacha_huachipato-125
viktormacha_huachipato-121
viktormacha_huachipato-120
previous arrow
next arrow

Talcahuano

Siderurgica Huachipato

The decision to build an integrated metallurgical plant in Concepción was taken during the presidency of Juan Antonio Ríos in 1946. The ironworks were named ´Compañía de Acero del Pacífico´, also known as CAP and were the largest steel making site in Chile.

The Compañía Siderúrgica Huachipato (CSH), Chile’s largest steelmaker, shut down its blast furnace, steel mill and continuous casting operation on 16 September, thereby beginning its complete shutdown some 74 years after its launch.

https://www.latinnews.com/component/k2/item/102961.html?archive=33&Itemid=6&cat_id=834687:chile-largest-steel-plant-closes

Image photography

By Viktor Macha in 2024.

Plant facts and figures

Full description

The production was inaugurated in 1950 with one blast furnace, a coke plant, an open-hearth shop and a bar mill. The planned annual capacity of the plant was 182,000 tonnes of steel.

But then, on 21 May 1960, a devastating earthquake struck, significantly damaging the town and the works as well. Despite the considerable damage, steel production was resumed after eleven days only.

The second blast furnace was put into operation in 1966.
In 1976 the modern LD converters with a capacity of 90 tonnes replaced the outdated open-hearth furnaces.

In the early 1980s the plant was completely reorganised and new company called “Grupo de Empresas CAP” was formed.

In 1990 the construction of the second coking plant was completed, fully replacing the original one from the 1950s.

In 2008 Danieli supplied a state-of-the-art rolling mill for steel bars and rebars production.

However, on 27 January 2010, another strong earthquake hit Concepcion hard, now paralysing the production for two long months.

In 2013 the hot strip mill was mothballed for low demand.

The final end came in 2024, when the mill could no longer resist massive imports of cheap Chinese steel. The heavy end operations were ceased for on the 16th of September.

Main data

Owner

The plant is owned by Grupo CAP

Address

Plant address: Gran Bretaña 2910, Talcahuano, Bío Bío, Chile

Country

The plant is located in Chile

Find similar plants

Steel Plants Search Compact

CHOOSE LOCATION

CHOOSE PROCESS

CHOOSE PRODUCTS

CHOOSE CREATOR

Latest plants on our platform