Dříň
Trinecke Zelezarny Drin
The decission to built a modern steel making facility on the plain fields near Kladno was made in 1971. The construction of electric steel mill with two 100t EAFs, 4 strand continuous caster and following billet and middle-section mill started a year after only.
Image photography
By Viktor Macha in 2012.
Plant facts and figures
The plant have an annual capacity of 900000 tons.
The following processes are conducted in the plant:
- Rolling mill
This plant produces the following type of products:
- Bars
Full description
The decission to built a modern steel making facility on the plain fields near Kladno was made in 1971. The construction of electric steel mill with two 100t EAFs, 4 strand continuous caster and following billet and middle-section mill started a year after only.
Today only the billet rolling mill is still active with 4 double-chamber soaking pits, two walking beam furnaces, 1160mm blooming stand, and three in a row 850mm billet stands. The electric steel plant was closed down and demolished in 2003.
Since 2002 the rolling mill is owned by Trinecke zelezarny company.