0Zaporizhstal - lit¡ do martinsk‚ pece
Zaporizhstal - blokovna
Zaporizhstal - coil box
Zaporizhstal - dokonŸovac¡ stojany side a
Zaporizhstal - dokonŸovac¡ stojany
Zaporizhstal - hlubinn‚ pece b
Zaporizhstal - lit¡ ingot… det
Zaporizhstal - u hlubinněch pecˇ
Zaporizhstal - v lcovna pas… celk b
Zaporizhstal - v lcovna za studena
Zaporizhstal - vysok  pec Ÿ.4 lic¡ hala
Exit full screenEnter Full screen
 
previous arrow
next arrow
0Zaporizhstal - lit¡ do martinsk‚ pece
Zaporizhstal - blokovna
Zaporizhstal - coil box
Zaporizhstal - dokonŸovac¡ stojany side a
Zaporizhstal - dokonŸovac¡ stojany
Zaporizhstal - hlubinn‚ pece b
Zaporizhstal - lit¡ ingot… det
Zaporizhstal - u hlubinněch pecˇ
Zaporizhstal - v lcovna pas… celk b
Zaporizhstal - v lcovna za studena
Zaporizhstal - vysok  pec Ÿ.4 lic¡ hala
previous arrow
next arrow

Zaporozhye

Zaporizhstal Zaporozhye

The decision to build the giant plant for processing and production of ferrous and non-ferrous metals has been made by the government in 1929, the construction began two years later.

A steel plant ready for war shows hit to Ukraine’s economy.

https://apnews.com/article/russia-ukraine-war-economy-metal-industry-6494b245289f795ff2c3da87e9d2eba1

Image photography

By Viktor Macha in 2016.

Plant facts and figures

The plant have an annual capacity of 4000000 tons.

The following processes are conducted in the plant:

  • Iron making
  • Steel making
  • Rolling mill

This plant produces the following type of products:

  • Coils
  • Ingots
  • Pig iron

Full description

The decision to build the giant plant for processing and production of ferrous and non-ferrous metals has been made by the government in 1929, the construction began two years later.
In 1933 the first blast furnace was put into operation, with capacity of 960m³ the most powerful in Ukraine back then. Blast furnace no. 2 with volume of 1300m³ was built during following year and used to be the largest one worldwide for a while. In 1935 construction of the open-hearth shop was finished and the blooming mill with soaking pits area was commissioned in 1937.

Not only ukrainian metallurgy milestone represents the year 1938, when american company “United Engineering of Pittsburgh” installed brand new hot strip mill here as the very first one in whole Europe. After this the production focused on agricultural and automotive industries mainly. Dynamic development of Zaporizhstal freezed completely during the war years. The plant was shutdown and larger part of unique machineries was transported to Magnitogorsk (http://viktormacha.com/galerie/mmk-magnitogorsk-195/ ).

The production was restarted in 1947 by ignition of first all-welded blast furnace in the country (its construction took 34 days only).

Since 2012 the mill is part of Metinvest Holding. The annual production of 4.5 million tons of steel handles more than 14,000 employees.

Main data

Owner

The plant is owned by Metinvest

Address

Plant address: Pivdenne Hwy, 80, Zaporizhzhia, Zaporizhia Oblast

Country

The plant is located in Ukraine

Find similar plants

Steel Plants Search Compact

CHOOSE LOCATION

CHOOSE YEAR PHOTOGRAPHED

CHOOSE CAPACITY

2000000

CHOOSE PROCESS

CHOOSE PRODUCTS

CHOOSE CREATOR

Latest plants on our platform