ŽĎAS Žďár nad Sázavou

Behind the foundation of Zdar steelworks stands original plan to relocate the foundry Storek-Urks in Brno to another economically more advantageous location.

Image photography

By Viktor Macha in 2018.

Plant facts and figures

The plant have an annual capacity of 50000 tons.

The following processes are conducted in the plant:

  • Steel making
  • Forge

This plant produces the following type of products:

  • Ingots
  • Castings
  • Forgings

Full description

Behind the foundation of Zdar steelworks stands original plan to relocate the foundry Storek-Urks in Brno to another economically more advantageous location. Most favorable conditions for such a project offered Zdar nad Sazavou. The construction of new mill started in 1947.

A very new addition into the original concept of the tripartite steel-shop hall, which was formerly planned for Voestalpine mill in Linz, but dismantled and transported to Czechoslovakia within the post-war compensations. After the final installation of three arc furnaces was the manufacturing facility named as “Žďárské engineering works and foundries” finally, ZDAS in other words.

The production itself started on 28th of August 1951 by symbolic church-bell casting. The company had over 1000 employees in that time already.

Production is focused on three main sectors from the beginning: metallurgy components, tools and equipment for rolling mills.

The production range has not been changed even after sixty years on the field. Primary metallurgy is provided by three electric arc furnaces and following ladle and vacuum furnaces. Ingots up to weight of 21 tons are processed at three forging presses. Single casts capacity goes up to weight of 45 tons.

Main data

Owner

The plant is owned by CEFC Group

Address

Plant address: Strojírenská 675/6 591 01 Žďár nad Sázavou

Country

The plant is located in Czech Republic

Find similar plants

Steel Plants Search Compact

CHOOSE LOCATION

CHOOSE YEAR PHOTOGRAPHED

CHOOSE CAPACITY

2000000

CHOOSE PROCESS

CHOOSE PRODUCTS

CHOOSE CREATOR

Latest plants on our platform