0ZTS Metalurg - kov n¡ 1
ZTS - EOP 2 front
ZTS - kov rna det
ZTS - lit¡ do forem 3
ZTS - manipul tor small
ZTS - odpich pece
ZTS - pưihazov n¡ do pece 2
ZTS - sl‚v rna ex
ZTS Metalurg - kov n” 3
ZTS Metalurg - kovac¡ lis front
ZTS Metalurg - manipul tor 1
ZTS Metalurg - nahư¡vac¡ pec
Exit full screenEnter Full screen
 
previous arrow
next arrow
0ZTS Metalurg - kov n¡ 1
ZTS - EOP 2 front
ZTS - kov rna det
ZTS - lit¡ do forem 3
ZTS - manipul tor small
ZTS - odpich pece
ZTS - pưihazov n¡ do pece 2
ZTS - sl‚v rna ex
ZTS Metalurg - kov n” 3
ZTS Metalurg - kovac¡ lis front
ZTS Metalurg - manipul tor 1
ZTS Metalurg - nahư¡vac¡ pec
previous arrow
next arrow

Dubnica Nad Vahom

ZTS Metalurg Dubnica Nad Vahom

The rising fear from Nazism led into relocation of a significant part of the Škoda Plant production in Pilsen to strategically more favorable town of Dubnice nad Váhom in 1937.

The plant was shutdown by the end of 2019.

https://www.finance.cz/522970-czechoslovak-group-zavre-podnik-zts-metalurg-v-dubnici-nad-vahom/

Image photography

By Viktor Macha in 2018.

Plant facts and figures

The plant have an annual capacity of 200000 tons.

The following processes are conducted in the plant:

  • Forge

This plant produces the following type of products:

  • Forgings

Full description

The rising fear from Nazism led into relocation of a significant part of the Škoda Plant production in Pilsen to strategically more favorable town of Dubnice nad Váhom in 1937.

The production in the newly built underground factory was exclusively focused on military equipments.
During the German occupation, the plant was incorporated into the Hermann Göring Waffenwerke concern. At the end of the war, however, most surface buildings were significantly damaged by allied air raids, and underground technology was destroyed by the fleeing army.

Between 1945-1948 the plant was generaly revamped, new production range consisted of bridge constructions, heavy machinery and locomotives.

In 1953 the steel foundry was commissioned.
In 1960 the closed-die forging shop was launched and open-die forging followed in 1963.

Production reaches its peak during the 1980s, when the works had over 15,000 employees.

The plant is known as ZTS Metalurg since 2015.

In 2018 the steel foundry was shutdown for good and the company is focusing on forged products mostly.

Main data

Owner

The plant is owned by ZTS Metalurg

Address

Plant address: Továrenská 56, 018 41 Dubnica nad Váhom

Country

The plant is located in Slovakia

Find similar plants

Steel Plants Search Compact

CHOOSE LOCATION

CHOOSE YEAR PHOTOGRAPHED

CHOOSE CAPACITY

2000000

CHOOSE PROCESS

CHOOSE PRODUCTS

CHOOSE CREATOR

Latest plants on our platform